Case Studies

An Engineering Company
A local engineering company required an extension to their stores building which had to be joined onto the existing building and erected in minimum time so as not to disrupt deliveries. We supplied a 1200 sq ft building with a 4 metre eave and an electric roller shutter door.

It was erected in 3 days over a Bank Holiday weekend and was in use the next morning within minutes of the factory opening for work.
Temporary Warehouse
The finished Building
   


A Large London Concert Event Structure
Another customer was involved in erecting a temporary concert venue with seating for 10,000 people at an internationally known location in London. The whole structure had to be erected in only 3 months and although temporary it was to be in place for 18 months.

For various reasons the backstage area had to be particularly secure - so we supplied our planking system, including internal steel reinforcements, which was then incorporated into an Aluminium frame so that the contractors could build a rigid, impenetrable outer wall in record time.
Temporary Warehouse
 
A concert venue with seating for 10,000 people at an internationally known location in London.


A Large Customer
Advantage Cover Fabrications Ltd, Unit 5 Earlstrees Court, Earlstrees Road, Earlstrees Ind Est, Corby, Northants,NN17 4AX